Every job below is one we do ourselves across Aurora.
We build new decks from the footings up, sized and framed to carry the load you actually plan to put on them, furniture, a hot tub, a crowd for the Fourth of July. Footings go below the frost line so the structure doesn't heave when the ground freezes and thaws.
Soft boards, shifted posts, and railings that move when you lean on them get fixed as the specific problem they are, not pushed into a full rebuild you don't need. Most repair calls come down to a failed ledger connection or a few boards that trapped water and started rotting from underneath.
We strip old finish back to bare wood, let it dry fully, then apply a stain and sealer rated for the sun and freeze-thaw cycles this area gets. Skipping the strip step and coating over old finish is why a lot of stain jobs peel within a year.
Multi-level decks, built-in benches, wraparound stairs, we design around the yard you have instead of a stock layout. We'll walk through board direction, railing style, and where the stairs make sense before any lumber gets ordered.
Composite boards don't need restaining and hold up better against moisture than pressure-treated lumber, though the upfront cost runs higher. We install with hidden fastener systems so you don't see screw heads across the whole surface.
Loose balusters, posts that rock, top rails pulled away from the posts, we rebuild rail systems to the height and baluster spacing code requires. A railing that's technically still standing isn't the same as one that's actually safe to lean on.
If the frame underneath is sound but the decking boards are cupped, splintering, or gray past saving, we strip the old boards and resurface without touching the structure. It costs less than a full rebuild and the deck looks new from the top down.
Old decks get torn out board by board, nails and screws swept up, and lumber hauled off, so the site's ready for a new deck or just a clean yard. We check first whether the existing footings can be reused before tearing everything out.
A pergola or shade structure built onto or next to an existing deck, sized to the posts and beams that are already carrying weight. We check the existing deck framing can handle the extra load before attaching anything to it.
When a deck feels bouncy or a beam has started to sag, it's usually undersized joists or a beam never rated for the span it's covering. We re-frame to current joist spacing standards, even if that means pulling up the decking to get at it.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
These are the towns where we actually show up and do the work.
Common questions once a deck project is actually underway.
Describe the problem and we will tell you what it probably is. No obligation.